This private residence on San Domingo Creek had a deteriorating bulkhead. The owners elected to remove the bulkhead and install a Living Shoreline. Environmental Concern removed 1,350 ft of failing bulkhead. Sand was placed to create the marsh plain. A low-profile stone sill was installed to protect the marsh edge.
Environmental Concern (EC) surveyed, designed the project, obtained all necessary permits, constructed the Living Shoreline, and planted the shoreline with native plants grown in EC’s native plant nursery.